Bricklaying Inspection and Test Plan template
Checklists for bricklaying work with the points that matter most marked as hold, witness or review.
Brick and block work
Walls from first course to finish · 8 checkpoints · 1 hold, 0 witness
- 1Setout and first course levelReviewLine and level checked
- 2DPC and flashings in placeReviewDamp course lapped
- 3Mortar mix and jointsReviewMix ratio and joint finish
- 4Wall plumb, level and straightReviewChecked every few courses
- 5Wall ties and reinforcementReviewSpacing and fixing
- 6Control joints and weep holesReview
- 7Inspection before lintels or slabHold pointSign-off
- 8Cleaned down and pointedReview
Run it in OzHub
Take a photo at each checkpoint inside the app. OzHub records the time from our server and the place from the phone, keeps a fingerprint of the photo, sends hold points to your manager, and gives your client a link to approve. Read more on the ITP app page.
General information only. Follow your project specification, engineer, certifier and the relevant Australian Standards. See the disclaimer.
Questions
What is an ITP for bricklaying work?
An Inspection and Test Plan lists the checks, tests and sign-offs needed on bricklaying work, in order. Each line is a checkpoint: a hold point (work stops until approved), a witness point (the client may attend) or a review check.
Which bricklaying checkpoints are hold points?
Hold points in this template: Inspection before lintels or slab.
Can I edit this template?
Yes. In OzHub you can copy a template, add or remove checkpoints and change which ones are hold or witness points. Your project specification and engineer come first.
Does my client need the app?
No. They get a private link by email, see the checkpoints and photos, type their name and approve or reject. No app or login.