Plastering Inspection and Test Plan template

Checklists for plastering work with the points that matter most marked as hold, witness or review.

Plasterboard and set

Sheeting, stopping and finish · 7 checkpoints · 0 hold, 0 witness

  1. 1
    Framing straight and inspected first
    Frame signed off before lining
    Review
  2. 2
    Insulation and services in before sheeting
    Photo before closing the wall
    Review
  3. 3
    Sheets fixed and screws set
    Fixing spacing and depth
    Review
  4. 4
    Joints taped and stopped
    Review
  5. 5
    Sanded and set coat applied
    Review
  6. 6
    Corners, cornices and finish
    Straight and square
    Review
  7. 7
    Final surface check in light
    Check with a work light
    Review

Run it in OzHub

Take a photo at each checkpoint inside the app. OzHub records the time from our server and the place from the phone, keeps a fingerprint of the photo, sends hold points to your manager, and gives your client a link to approve. Read more on the ITP app page.

General information only. Follow your project specification, engineer, certifier and the relevant Australian Standards. See the disclaimer.

Questions

What is an ITP for plastering work?

An Inspection and Test Plan lists the checks, tests and sign-offs needed on plastering work, in order. Each line is a checkpoint: a hold point (work stops until approved), a witness point (the client may attend) or a review check.

Which plastering checkpoints are hold points?

This plastering template uses witness and review checks and no hold points. You can mark any line as a hold point in OzHub.

Can I edit this template?

Yes. In OzHub you can copy a template, add or remove checkpoints and change which ones are hold or witness points. Your project specification and engineer come first.

Does my client need the app?

No. They get a private link by email, see the checkpoints and photos, type their name and approve or reject. No app or login.