OzHub
ITP template

Flooring Inspection and Test Plan template

Checklists for flooring work with the points that matter most marked as hold, witness or review.

Timber, vinyl and carpet flooring

Subfloor to finish · 6 checkpoints · 0 hold, 0 witness

  1. 1
    Subfloor flat, dry and clean
    Moisture reading photographed
    Review
  2. 2
    Acclimatisation of materials
    Review
  3. 3
    Underlay or adhesive applied
    Review
  4. 4
    Boards or sheets laid to layout
    Expansion gaps and direction
    Review
  5. 5
    Trims, edges and thresholds
    Review
  6. 6
    Final clean and defect check
    Review

Run it in OzHub

Take a photo at each checkpoint inside the app. OzHub records the time from our server and the place from the phone, keeps a fingerprint of the photo, sends hold points to your manager, and gives your client a link to approve. Read more on the ITP app page.

General information only. Follow your project specification, engineer, certifier and the relevant Australian Standards. See the disclaimer.

Questions

What is an ITP for flooring work?

An Inspection and Test Plan lists the checks, tests and sign-offs needed on flooring work, in order. Each line is a checkpoint: a hold point (work stops until approved), a witness point (the client may attend) or a review check.

Which flooring checkpoints are hold points?

This flooring template uses witness and review checks and no hold points. You can mark any line as a hold point in OzHub.

Can I edit this template?

Yes. In OzHub you can copy a template, add or remove checkpoints and change which ones are hold or witness points. Your project specification and engineer come first.

Does my client need the app?

No. They get a private link by email, see the checkpoints and photos, type their name and approve or reject. No app or login.