Carpentry Inspection and Test Plan template

Checklists for carpentry work with the points that matter most marked as hold, witness or review.

Timber framing

Walls, floors and roof frames (AS 1684) · 7 checkpoints · 1 hold, 0 witness

  1. 1
    Frame drawings and engineer details
    Latest set on site
    Review
  2. 2
    Bottom plates and bearers set out
    Level and fixed down
    Review
  3. 3
    Studs, noggings and lintels
    Sizes and spacing
    Review
  4. 4
    Bracing and tie-downs fitted
    Bracing per plan
    Review
  5. 5
    Roof framing and connections
    Trusses or rafters, straps and tie-downs
    Review
  6. 6
    Frame inspection before lining
    Inspector or manager sign-off
    Hold point
  7. 7
    Frame straight and plumb
    Tolerance check
    Review

Decking and pergolas

Posts, framing and boards · 6 checkpoints · 0 hold, 0 witness

  1. 1
    Footings and posts set out
    Review
  2. 2
    Post fixings and bearers
    Brackets and bolts
    Review
  3. 3
    Joists level with correct spacing
    Review
  4. 4
    Boards fixed with gaps
    Gaps, fixings and end sealing
    Review
  5. 5
    Balustrade height and strength
    Heights and fixings
    Review
  6. 6
    Final finish and oil or stain
    Review

Run it in OzHub

Take a photo at each checkpoint inside the app. OzHub records the time from our server and the place from the phone, keeps a fingerprint of the photo, sends hold points to your manager, and gives your client a link to approve. Read more on the ITP app page.

General information only. Follow your project specification, engineer, certifier and the relevant Australian Standards. See the disclaimer.

Questions

What is an ITP for carpentry work?

An Inspection and Test Plan lists the checks, tests and sign-offs needed on carpentry work, in order. Each line is a checkpoint: a hold point (work stops until approved), a witness point (the client may attend) or a review check.

Which carpentry checkpoints are hold points?

Hold points in this template: Frame inspection before lining.

Can I edit this template?

Yes. In OzHub you can copy a template, add or remove checkpoints and change which ones are hold or witness points. Your project specification and engineer come first.

Does my client need the app?

No. They get a private link by email, see the checkpoints and photos, type their name and approve or reject. No app or login.