Solar PV install and commissioning

Panels, inverter and grid connection · 8 checkpoints · 1 hold, 1 witness

  1. 1
    Roof and structure checked
    Suitable and safe
    Review
  2. 2
    Mounting rails and fixings installed
    Fixings sealed
    Review
  3. 3
    Panels installed and secure
    Review
  4. 4
    DC cabling and isolators
    Labelled and protected
    Review
  5. 5
    Inverter installed and wired
    Review
  6. 6
    Insulation and polarity tests
    Readings recorded
    Witness point
  7. 7
    Labels and shutdown signage fitted
    Review
  8. 8
    Commissioning and customer handover
    Hold point

Run it in OzHub

Take a photo at each checkpoint inside the app. OzHub records the time from our server and the place from the phone, keeps a fingerprint of the photo, sends hold points to your manager, and gives your client a link to approve. Read more on the ITP app page.

General information only. Follow your project specification, engineer, certifier and the relevant Australian Standards. See the disclaimer.

Questions

What is an ITP for solar work?

An Inspection and Test Plan lists the checks, tests and sign-offs needed on solar work, in order. Each line is a checkpoint: a hold point (work stops until approved), a witness point (the client may attend) or a review check.

Which solar checkpoints are hold points?

Hold points in this template: Commissioning and customer handover.

Can I edit this template?

Yes. In OzHub you can copy a template, add or remove checkpoints and change which ones are hold or witness points. Your project specification and engineer come first.

Does my client need the app?

No. They get a private link by email, see the checkpoints and photos, type their name and approve or reject. No app or login.