Solar PV install and commissioning
Panels, inverter and grid connection · 8 checkpoints · 1 hold, 1 witness
- 1Roof and structure checkedReviewSuitable and safe
- 2Mounting rails and fixings installedReviewFixings sealed
- 3Panels installed and secureReview
- 4DC cabling and isolatorsReviewLabelled and protected
- 5Inverter installed and wiredReview
- 6Insulation and polarity testsWitness pointReadings recorded
- 7Labels and shutdown signage fittedReview
- 8Commissioning and customer handoverHold point
Run it in OzHub
Take a photo at each checkpoint inside the app. OzHub records the time from our server and the place from the phone, keeps a fingerprint of the photo, sends hold points to your manager, and gives your client a link to approve. Read more on the ITP app page.
General information only. Follow your project specification, engineer, certifier and the relevant Australian Standards. See the disclaimer.
Questions
What is an ITP for solar work?
An Inspection and Test Plan lists the checks, tests and sign-offs needed on solar work, in order. Each line is a checkpoint: a hold point (work stops until approved), a witness point (the client may attend) or a review check.
Which solar checkpoints are hold points?
Hold points in this template: Commissioning and customer handover.
Can I edit this template?
Yes. In OzHub you can copy a template, add or remove checkpoints and change which ones are hold or witness points. Your project specification and engineer come first.
Does my client need the app?
No. They get a private link by email, see the checkpoints and photos, type their name and approve or reject. No app or login.