Glazing Inspection and Test Plan template
Checklists for glazing work with the points that matter most marked as hold, witness or review.
Windows, doors and glazing
Install and operation · 6 checkpoints · 0 hold, 0 witness
- 1Openings measured and plumbReviewSizes and squareness
- 2Windows and doors installed levelReview
- 3Flashings and sealants fittedReviewSealant applied all round
- 4Glass type and safety labelsReviewPhoto of label
- 5Doors and windows operate smoothlyReviewLocks and closers
- 6Final clean and protection removedReview
Run it in OzHub
Take a photo at each checkpoint inside the app. OzHub records the time from our server and the place from the phone, keeps a fingerprint of the photo, sends hold points to your manager, and gives your client a link to approve. Read more on the ITP app page.
General information only. Follow your project specification, engineer, certifier and the relevant Australian Standards. See the disclaimer.
Questions
What is an ITP for glazing work?
An Inspection and Test Plan lists the checks, tests and sign-offs needed on glazing work, in order. Each line is a checkpoint: a hold point (work stops until approved), a witness point (the client may attend) or a review check.
Which glazing checkpoints are hold points?
This glazing template uses witness and review checks and no hold points. You can mark any line as a hold point in OzHub.
Can I edit this template?
Yes. In OzHub you can copy a template, add or remove checkpoints and change which ones are hold or witness points. Your project specification and engineer come first.
Does my client need the app?
No. They get a private link by email, see the checkpoints and photos, type their name and approve or reject. No app or login.