Roofing Inspection and Test Plan template

Checklists for roofing work with the points that matter most marked as hold, witness or review.

Roof sheeting and flashings

Frame to watertight · 8 checkpoints · 0 hold, 1 witness

  1. 1
    Roof frame ready and safe
    Fall protection in place
    Review
  2. 2
    Sarking and insulation installed
    Review
  3. 3
    Battens and fixings set out
    Review
  4. 4
    Sheets laid and fixed
    Overlaps, screws and fixings
    Review
  5. 5
    Flashings and valleys installed
    Review
  6. 6
    Gutters and downpipes fitted
    Falls to downpipes
    Review
  7. 7
    Water test or rain check
    No leaks
    Witness point
  8. 8
    Final clean and fixings sealed
    Review

Run it in OzHub

Take a photo at each checkpoint inside the app. OzHub records the time from our server and the place from the phone, keeps a fingerprint of the photo, sends hold points to your manager, and gives your client a link to approve. Read more on the ITP app page.

General information only. Follow your project specification, engineer, certifier and the relevant Australian Standards. See the disclaimer.

Questions

What is an ITP for roofing work?

An Inspection and Test Plan lists the checks, tests and sign-offs needed on roofing work, in order. Each line is a checkpoint: a hold point (work stops until approved), a witness point (the client may attend) or a review check.

Which roofing checkpoints are hold points?

This roofing template uses witness and review checks and no hold points. You can mark any line as a hold point in OzHub.

Can I edit this template?

Yes. In OzHub you can copy a template, add or remove checkpoints and change which ones are hold or witness points. Your project specification and engineer come first.

Does my client need the app?

No. They get a private link by email, see the checkpoints and photos, type their name and approve or reject. No app or login.